Earthing and bonding in a railway tunnel means connecting every exposed conductive part, from OCS supports and running rails to tunnel reinforcement and cable trays, into one engineered circuit. A tunnel is a bounded metal envelope around the traction system, so return and fault currents interact with the lining whether the design acknowledges it or not. EN 50122-1 permits a prospective touch voltage of only 60 V rms on AC systems in normal operation, and that single limit shapes most bonding decisions underground.

Key Takeaways
- Tunnels concentrate earthing problems: lining reinforcement, lineside services and OCS hardware share one bounded cross section, so earthing behaves as a system property rather than a per-support detail.
- EN 50122-1 limits prospective touch voltage to 60 V rms AC and 120 V DC in normal long-term operation, with voltage-time curves governing short-term fault conditions.
- The international alignment of EN 50122-1 is IEC 62128-1:2013, and tunnels where AC and DC systems interact fall under EN 50122-3.
- Tunnel OCS hardware is standardized: supports and positioning devices fall under TB/T 2075.22-2024, and DC urban rail section insulators under TB/T 3252-2022.
- Where a permanent bond would create an unwanted current path, a voltage limiter bonds the part to earth only when a threshold is crossed.
- Tunnel earthing is verified by trending bond continuity, rail-to-earth resistance and structure potentials rather than by one-off acceptance readings.
Why is earthing different inside a railway tunnel?
A tunnel compresses every earthing problem of open route into a closed cross section. The reinforcement of the lining is a continuous conductor running the full tunnel length, cable routes and pipework cling to the same walls that carry the contact line, and maintenance staff cannot retreat the way they can along a fenced corridor. Any potential difference the traction system creates appears between surfaces that people and plant actually touch, which is precisely the exposure the touch voltage limits of EN 50122-1 exist to control.
Moisture worsens everything. Tunnel walls sweat, drainage paths flood intermittently, and ballast or slab track keeps its own humidity regime, so resistances that an outdoor design could treat as high and stable drift low and seasonal. The European framework for electrical safety, earthing and the return circuit is EN 50122-1, whose international alignment is IEC 62128-1:2013, and both treat the rails as part of a designed circuit rather than as an accidental conductor.
Topology is the third difference. An open route earths locally and the surrounding soil absorbs residual current, while a long tunnel behaves like a distributed electrode with a defined longitudinal impedance of its own. Designers therefore bond deliberately along the whole length instead of relying on soil contact at a handful of points, and they coordinate with the substation earth grid at each portal rather than treating the tunnel as an isolated island.
What does a tunnel earthing system include?
The visible parts are simple: a longitudinal earth conductor or cable ring running through the tunnel, bonding connections to every OCS support and walkway, and ties into the tunnel reinforcement at defined intervals. The invisible part is the decision about what is bonded permanently and what is bonded through a voltage limiter, because a solid connection is not always the safe answer. On DC systems in particular, a continuous rail to structure bond would feed stray current into the reinforcement and corrode it from within.
The running rails belong to the same electrical world. On AC lines they carry traction return current toward the substation; on DC lines they are deliberately insulated from earth to confine stray current, and the tunnel earthing design must respect that insulation while still meeting touch voltage limits. Combined AC and DC arrangements, common where mainline and metro infrastructure share a corridor, are governed by EN 50122-3.
Component standards settle the hardware side of the bond. Tunnel supports and positioning devices for the overhead contact system fall under TB/T 2075.22-2024, part of the Chinese OCS fittings series, and urban rail section insulators in DC tunnels are built to TB/T 3252-2022, with aluminium alloy runners and stainless steel fasteners specified for humid tunnel air. Specifying from these matched families keeps the mechanical and electrical interfaces consistent, a discipline described in detail for tunnel catenary support systems.
How do touch voltage limits drive the design?
Touch voltage is the potential difference a person can bridge, typically between a hand on a handrail and a foot on the walkway. The design must keep it below the limits of EN 50122-1 during normal operation, and inside the voltage-time curves of the same standard during faults, where higher values are tolerated only for the short durations the curves permit. The standard tables translate voltage into current through body impedance values, for example 1150 ohm in the EN 50122-1:2022 tables, which is how duration limits acquire their physiological meaning.
| Quantity | Limit or value | Unit | Reference |
|---|---|---|---|
| Prospective touch voltage, normal operation, AC systems | 60 | V rms | EN 50122-1 |
| Prospective touch voltage, normal operation, DC systems | 120 | V DC | EN 50122-1 |
| Body impedance example in the standard tables | 1150 | ohm | EN 50122-1:2022 |
| Combined AC and DC traction arrangements | voltage-time limits per the standard | curves | EN 50122-3 |
Source: EN 50122-1:2022 touch voltage limits and body impedance example; international alignment IEC 62128-1:2013; combined AC and DC arrangements per EN 50122-3.
How are tunnel supports and OCS components bonded?

Two philosophies govern the supports. Direct bonding ties every cantilever, bracket and ring into the earth conductor, which is the usual choice on AC tunnels because it holds all steelwork at one potential and gives fault current a metallic route home. The insulated arrangement keeps supports isolated and bonds them at defined points only, which suits DC tunnels where continuous rail to structure current must be prevented; the boundary case, a part that must float in normal service yet be protected under fault, is exactly where voltage limiters and spark gaps on OCS structures earn their place.
In DC tunnels the component choices follow the insulation philosophy. Section insulators separating feeding sections inside the tunnel are built to TB/T 3252-2022 for DC urban rail service, and the humidity of the environment pushes selection toward corrosion resistant runners and fasteners, as discussed for rigid section insulators in metro tunnel conductor rail systems. Every electrical joint in these runs is a maintenance item, because a degraded contact becomes both a thermal and a measurement problem.
Signaling shares the same steel. Insulated rail joints and impedance bonds live inside the tunnel too, and the traction return arrangements chosen for earthing directly change what the track circuits see; the interaction is treated in track circuits and traction currents. Coordinating the two disciplines at design stage is far cheaper than renegotiating bonding after signaling instability appears in service.
How is tunnel earthing tested and maintained?
Testing is trend based. Periodic surveys measure bond continuity across joints and supports, rail-to-earth resistance along the tunnel, and structure-to-earth potentials under operating traffic, and the value lies in the trend rather than any single reading. A structure potential that drifts, or a resistance that drops season after season, points at a specific degradation long before it becomes a safety event, and the survey intervals concentrate where the readings move.
The failure analysis literature for metro tunnels anchors this practice in standards such as TB/T 2073—2020 for the technical conditions of OCS components and IEC 62128-1:2013 for earthing and the return circuit; the same trend-based philosophy applied to DC hardware is laid out in failure mode analysis for metro section insulators. Lightning entering through the OCS also lands on the tunnel earthing system at the portal zones, and the arrester and shielding measures that limit that duty are covered under catenary lightning protection and earthing design.
Frequently Asked Questions
What is an earthing system?
An earthing system is the arranged set of conductors and electrodes that connects exposed conductive parts of an installation to earth, so that fault and leakage currents flow along controlled paths instead of through people. In a railway tunnel it bonds OCS supports, rails where required, reinforcement and cable trays into one network, designed against the touch voltage limits of EN 50122-1.
What is rail bonding?
Rail bonding ties rail lengths, turnouts and crossings into a continuous electrical circuit so that traction return current follows the rails instead of the earth. Bonds are cables or welded links sized for the return current, and their condition matters because a failed bond pushes current into unintended paths, raises rail potentials and distorts track circuit operation.
What is main protective bonding?
Main protective bonding connects exposed conductive parts and extraneous conductive parts, such as tunnel reinforcement, pipework and cable trays, so that no dangerous potential difference can build up between them during a fault. In tunnel practice it is the backbone that keeps every touched surface at effectively the same potential, complementing the touch voltage limits of EN 50122-1.
What is substation earthing?
Substation earthing is the electrode grid and bonding network that safely disperses fault current and limits step and touch voltages around a substation. On traction systems it also anchors the return circuit, and it is verified by measuring earth resistance and checking connection continuity, with touch voltage held to 60 V rms AC in normal operation under EN 50122-1.
Practical Takeaways for Tunnel Projects
Treat the tunnel as one distributed electrode, not as a row of independent supports. Anchor the design to the EN 50122-1 touch voltage limits and the IEC 62128-1:2013 alignment, decide the bonding philosophy per system polarity before hardware is chosen, and then specify components from matched families: tunnel supports to TB/T 2075.22-2024 and DC section insulators to TB/T 3252-2022.
We manufacture the overhead contact system side of this discipline, from tunnel support and positioning hardware to section insulators for AC and DC service. If your tunnel project is resolving earthing and hardware interfaces together, contact our engineering team.