OCS SECTIONING & SWITCHING / 25 kV AC · 1.5 kV DC CRCC CERTIFIED / TB/T · GB · IEC

Steel Cantilever Support Assembly (200–250 km/h)

Complete galvanized-steel cantilever assembly for 200–250 km/h passenger dedicated lines and lines below 200 km/h.

Steel Cantilever Support Assembly (200–250 km/h)

Specifications

ModelSeries products (supplied per design drawing number)
StandardTB/T 2075 series and the simplified (unified) technical requirements
MaterialsAluminum / hot-dip galvanized steel cantilever tubes, forged connectors
InstallationSuspended on the post-side insulator string; flat + inclined cantilever configuration

The Steel Cantilever Support Assembly (200–250 km/h) is a complete cantilever support device for electrified railway overhead contact systems, suitable for 200–250 km/h electrified railway passenger dedicated lines as well as electrified lines below 200 km/h.

Composition

Flat cantilever, inclined cantilever, clevis double eye, messenger wire seat, support pipe clip, cantilever support tube and tube cap.

The flat cantilever carries the messenger wire seat, the inclined cantilever provides the mounting reference for the positioning device, and the support member closes the load-bearing triangle. All connectors are forged for fatigue resistance and every tube carries anti-corrosion protection matched to the environment.

Supply and Quality Control

The product is manufactured under CRCC railway product certification and an ISO 9001 quality management system, with incoming material inspection, in-process control on critical operations and batch-by-batch final inspection before delivery. As a series product the assembly is supplied per design drawing number; interface dimensions, materials and type test documentation are confirmed with the customer before manufacture.

Henan Chuangwit Railway Equipment Co., Ltd. supports selection calculation, drawing confirmation, batch supply and site technical guidance for traction power projects.

Frequently Asked Questions

What does the assembly consist of?

The complete assembly is supplied as: flat cantilever, inclined cantilever, clevis double eye, messenger wire seat, support pipe clip, cantilever support tube and tube cap. Components are matched in interface dimensions so the assembly bolts together on pre-assembly jigs or directly at the mast.

Which speed class does it cover?

It is suitable for 200–250 km/h electrified railway passenger dedicated lines as well as electrified lines below 200 km/h. Supply follows the design drawing numbers of the project, with the speed-class configuration confirmed at order stage.

How is the assembly mounted?

It hangs on the post-side insulator string in the flat-plus-inclined cantilever configuration; the base and insulator interface follows the mast type and the OCS cross-section drawings.

Can it be supplied to our project drawings?

Yes. The assemblies are series products supplied per design drawing number; Henan Chuangwit confirms interface dimensions, materials and test documentation against your drawings before manufacture.

Performance

Operating Conditions

Mainline and station OCS support structures, carrying suspension loads, wind loads and vibration through the post-side insulator string into the mast.

Mechanical Performance

Assembly strength covers the combined maximum ice and wind load cases; forged connectors give high fatigue resistance; hot-dip galvanized / aluminum construction suits long outdoor service.

Electrical Performance

The assembly carries the energized messenger wire at full line potential; insulation to the earthed mast is provided by the cantilever insulators (rod or string type) at the mounting interface.

Applications

200–250 km/h PDL

Designed speed class for passenger dedicated lines.

≤200 km/h Lines

Also covers conventional electrified lines.

Station Yards

Batch pre-assembly with matched fittings.

Ice & Wind Regions

Strength covers combined load cases.

Need a quote or datasheet? Email Us WhatsApp Telegram